Coming soon · in build · screens are the design target, figures illustrative
Defense Intelligence/Enterprise module

A defense contract is the last step of a two-year trail.
Start at the first.

Budget lines, requests for information, broad agency announcements, white papers, and awards, keyed to the program element and the solicitation number, so you can see what is coming, who wins, and what it is worth before the contract is signed.

For defense and dual-use investors, primes and their corporate development teams, specialist advisors, and allied-market suppliers.
What is comingEvery open call, RFI, and BAA keyed to its program element and budget line, with the stage it has reached and the typical time to award.
Who winsPrimes, subs, and incumbents by program office and vehicle, with set-aside share and how often the incumbent keeps the follow-on.
What it is worthComparable award by vehicle and program element: ceilings beside obligations, as a median with its range.
14
Defense markets
5
Trail stages read
6 to 18
Months of lead time
7
Evidence layers
Screens below are the design target for the module. Figures are illustrative until the module ships.
signals movingfollowed program
Scroll
01What is coming

Five stages. One program at a time.

A capability moves from a budget line to an award through public stages, each with its own record. The trail board shows where every program in your watch sits today, and what the same program office has taken at each step before.

Trail board · autonomy and hypersonics · 3 program offices
stages keyed by program element and solicitation · lags from the office's own history
01 Budget line
justification books · +0
Autonomous logisticsprogram element · FY27 +12%published Feb 2026
Hypersonic test infrastructureFY27 new startpublished Feb 2026
Counter-UAS, layeredFY27 +31%published Feb 2026
02 RFI
market research · ~4 mo
Autonomous logisticsRFI · 24 responsesclosed May 2026
Counter-UAS, layeredRFI open · 18 dcloses 29 Sep 2026
03 BAA / call
solicitation · ~9 mo
Autonomous logisticsBAA open · closes 11 Octsolicitation keyed · est. $40M
Quantum sensing, navigationcall · 3 topicsclosed Aug 2026
04 White paper
down-select · ~14 mo
Quantum sensing, navigation9 invitedfrom 41 · 22%
05 Award
contract · ~20 mo
Multi-domain planning AI$340M · prime namedJun 2026 · 22 mo from budget line
Hypersonic glide, phase 2$1.1BMar 2026 · IDIQ · 3 primes
stage lags are medians on the same program office · open items dated · nothing on the board is scheduled by the module
02Who wins

Incumbency is measured, not assumed.

Who wins in a program office, how often the incumbent keeps the follow-on, and what share goes to set-asides, read on the recipient of record through resolved parents and subsidiaries.

Who wins · autonomy program office · 36 months

primes on award · subs where disclosed · n=31 awards
Prime Aincumbent on 3 of 4 follow-ons
$1.2B · 9
38%
Prime Bnew entrant 2024 · 2 awards
$610M · 4
19%
Federally funded labresearch awards
$340M · 7
11%
Small business set-aside, 6 firmsset-aside share of awards
$280M · 11
9%
Incumbent kept the follow-on7 of 9 · 78%
03What it is worth

Ceilings are not obligations.

A comparable award is a median with its range by vehicle and program element, obligated at award. Ceilings are shown beside it and never mixed in.

What it is worth · by vehicle

comparable award · obligated at award · ceiling beside it
Single award, R&Dn=14
$12M med · $4M to $41M
IDIQ task ordern=9
$38M med · $9M to $140M
OTA prototypen=6
$6M med · $2M to $19M
IDIQ ceilingnot obligated
$2.4B ceiling · 11% obligated
Ceiling and obligation are different measures. The card shows both and never adds them.
05Workbench

Objects left. Links center. Evidence right.

Select a program element and the picture redraws around it: the budget line, the calls it has produced, the white papers invited, the awards made, the primes and subs on them. The dossier serves the stage the program is at, the vehicles it uses, and the incumbency on its follow-ons.

app.svatantra.ai / defense / workbench
Svatantra
Ent
Programs412
Autonomous logistics
Counter-UAS, layered
Quantum sensing, navigation
Calls38 open
Autonomous logistics BAA · 11 Oct
Primes and subs1,908
Prime A
Prime B
Vehicles
Autonomy IDIQ · $2.4B ceiling
Program offices
Army, autonomy
DARPA, tactical
Autonomous logistics · trail
program element keyed
01 Budget line
justification books · +0
Autonomous logisticsprogram element · FY27 +12%published Feb 2026
Hypersonic test infrastructureFY27 new startpublished Feb 2026
Counter-UAS, layeredFY27 +31%published Feb 2026
02 RFI
market research · ~4 mo
Autonomous logisticsRFI · 24 responsesclosed May 2026
Counter-UAS, layeredRFI open · 18 dcloses 29 Sep 2026
03 BAA / call
solicitation · ~9 mo
Autonomous logisticsBAA open · closes 11 Octsolicitation keyed · est. $40M
Quantum sensing, navigationcall · 3 topicsclosed Aug 2026
04 White paper
down-select · ~14 mo
Quantum sensing, navigation9 invitedfrom 41 · 22%
05 Award
contract · ~20 mo
Multi-domain planning AI$340M · prime namedJun 2026 · 22 mo from budget line
Hypersonic glide, phase 2$1.1BMar 2026 · IDIQ · 3 primes
lags from the office history
Autonomous logistics
program element · Army, autonomy office · FY27 +12%

Stage

today
CurrentBAA open · closes 11 Oct
Typical to award from here11 mo median · n=9
White papers, prior call9 of 41 invited

Who wins here

program office · 36 months
Prime A$1.2B · 9 · 38%
Incumbent keeps follow-on78%
Set-aside share9%

Comparable award

by vehicle
IDIQ task order$38M · $9M to $140M
Single award R&D$12M · $4M to $41M
basis: award to prime (attributed) / call to program element (keyed)
justification books FY27 · solicitation index 2026-09
ceilings shown apart from obligations · figures carry n
06Board and canvas

Build the case by dragging. Every card fills itself from the record.

Drop a program, a call, a prime, or a vehicle onto the board. Ties carry the figure, the basis, and the n. Stage transitions carry the observed lag from the program's own history, never a schedule the module invented.

app.svatantra.ai / defense / board
Svatantra
Ent
Export memoDeadlines (.ics)Incumbency lensBring your own listAsk the boardas of: 11 Sep 2026
attributedkeyed
Live: drag the cards
program
Autonomous logistics
StageBAA open · 31 d
Comparable award$38M median
call · open
Autonomy BAA FY27
Closes11 Oct · 31 d
Topics4
prime
Prime A
Office awards$1.2B · 9
Follow-ons kept3 of 4
vehicle
Autonomy IDIQ
Ceiling$2.4B
Obligated11%
suggested
+ 4 links
2 subs · 1 lab · 1 office
KeepDismiss
Served rows only. Stage lags are the office's own medians with n. Pinned programs are watched: new calls and awards arrive in your digest.
08Evidence

Seven layers on every figure.

Nothing on a ledger, a board, or a memo is computed on the fly from a model. It is served from the record, with its basis and its n. The standard is the same on the first day the module ships.

1Source attribution
2Statistical transparency
3Methodology disclosure
4Outcome logging
5Confidence framework
6Dissenting evidence
7Audit trail

Bring a program element. Leave with the trail.

The module is in build. Design partners get the first seats, a monthly call with the founder, and a say in what the workbench serves first. Bring your own capability areas to the walkthrough.