Coming soon · in build · screens are the design target, figures illustrative
Critical Minerals Intelligence/Enterprise module

A mineral supply chain runs through six governments on four continents.
One screen.

Offtake, stockpile purchases, sovereign equity, development finance, strategic project designations, permits, bans, and export controls from every government on the chain, keyed to the mineral and the stage, across 16 markets, so you can see where the chain breaks, which government is funding it, and what is restricted where.

For resources and commodity investors, battery and defense supply-chain teams, trading houses, sovereign funds, development finance institutions, and the ministries that sit on the chain, in the Americas, Europe, the Gulf, and Asia-Pacific.
Where the chain breaksCapacity share by country at every stage from mine to cell, across 16 markets, and the stage where one jurisdiction holds the chain.
Which government is funding itPublic money by financing government and instrument: US, EU, Japan, Australia, Canada, Korea, India, Gulf funds, and the multilaterals, keyed to the project.
What is restricted, whereExport bans, licensing regimes, tariffs, quotas, and accelerated permitting by jurisdiction, dated, with the stage each acts on.
16
Markets read
9
Financing governments
34
Minerals in the lexicon
5
Chain stages
Screens below are the design target for the module. Figures are illustrative until the module ships.
mine stagedownstream stageconcentrated stage
Scroll
01Where the chain breaks

Five stages, sixteen markets. One country usually holds one stage.

Capacity share by country at every stage of a mineral's chain, with the stage where one jurisdiction holds the chain marked in red, and the government action on each stage beside it. The same matrix reads for any of the 34 minerals in the lexicon.

Chain matrix · 4 minerals · 5 stages
capacity shares from the source edition · actions keyed to stage
Mine
Concentrate
Refine
Component
Cell / magnet
Lithiumhard rock and brine
AU 47% · CL 26%4 projects fundedfunded
AU · CL · ARspodumene, brinelinked
CN 68%hydroxide, carbonateconcentrated
KR · JP · UScathode · 2 DPA awardsfunded
CN · KR · UScells · 6 plants under loanfunded
Cobaltby-product
DRC 71%1 offtakeconcentrated
DRC · IDhydroxidelinked
CN 76%sulfateconcentrated
FI · KRprecursor · 1 loanfunded
no stage figure servedwithheld
Rare earthsNdPr
CN 60% · US 15% · AU 8%2 loansfunded
US · AU · MYseparation · 1 offtakefunded
CN 90%oxide to metalconcentrated
JP · USmagnet alloy · 1 DPA awardfunded
CN 92%magnets · export licence regimerestricted
Graphiteanode
CN 65% · MZ 13%linked
CN · MZlinked
CN 91%sphericalrestricted
US · KRsynthetic anode · 3 loansfunded
KR · USlinked
red: one jurisdiction above 60% at the stage · teal: government action on the stage in 24 months · withheld: no published figure
02Which government is funding it

Nine governments, one chain.

Development finance, sovereign equity, strategic designations, production credits, stockpile purchases, and offtake from every government on the chain, keyed to the project and placed on the stage it funds. Many projects carry two or three governments; the module shows the stack, not the headline financier.

Which government is funding it · lithium chain · 24 months

by financing government and instrument · keyed to the project · figures illustrative
GovernmentInstrumentStage · whereFigure
United StatesDevelopment finance loan, defense production awardRefine · US, AU · Mine · CL$2.6B · 5
JapanSovereign resources agency equity and loanRefine, separation · AU, MY$1.8B · 4
AustraliaCritical minerals facility loan, production creditRefine · AUA$1.1B · 3
European UnionStrategic project designation, development bank loanMine, refine · EU, ZA3 designated · loan pending
CanadaInfrastructure fund, tax creditMine · CAC$410M · 2
KoreaState stockpile purchaseConcentrate · KRvolume only
IndiaOverseas mining equity, production-linked incentiveMine · AR · Cell · IN$390M · 2
Gulf sovereign fundEquity in mine developerMine · CL, AU$620M · 2
MultilateralDevelopment bank guaranteeMine · ARno figure served
Figures stay in the currency of the instrument. Offtake is a volume. Nothing is converted with an assumed price or FX.

Co-financed projects · more than one government on the stack

where the funding lands on the chain · keyed to the project
Rare earth separation · AustraliaAustralia + Japan + United States · refine
3 govts
Graphite anode · Mozambique to United StatesUnited States + multilateral · mine to component
2 govts
Lithium hydroxide · AustraliaAustralia + Korea offtake · refine
2 govts
Nickel HPAL · IndonesiaIndonesia + China · concentrate to refine
2 govts
Cobalt refinery · FinlandEuropean Union + Finland · component
2 govts
Funded stage with the largest concentration gapRefine · CN 68 to 90%
Governments financing the refine stage outside CN6
Capacity shares carry the edition of the source they were read from.
03What is restricted, where

Controls, by jurisdiction, with the stage they act on.

Export bans at the mine, licence regimes at the refinery, tariffs at the border, and accelerated permitting inside a bloc, by jurisdiction and date, each mapped to the chain stage it acts on. Read across markets, they are the policy geography of the chain.

What is restricted, where · nickel, cobalt, graphite, rare earths, lithium

controls dated by jurisdiction · stage each acts on · in force unless marked
CN
Export controls on seven rare earth elements and related magnet itemsacts on: refine, component, magnet · licence required
4 Apr 2025
CD
Cobalt export suspension, extendedacts on: mine, concentrate · quota regime to follow
22 Feb 2025
EU
First strategic project list under the critical raw materials act · 47 projectsacts on: mine, refine, recycle · permitting accelerated · 2030 benchmarks
25 Mar 2025
CN
Antimony export licensingacts on: refine
15 Sep 2024
CN
Graphite export licensing, spherical and syntheticacts on: refine, component
1 Dec 2023
CN
Gallium and germanium export controlsacts on: refine
1 Aug 2023
MY
Rare earth raw ore export ban, policy announcedacts on: mine · refine onshore required
Sep 2023
ZW
Raw lithium ore export banacts on: mine · concentrate onshore required
Dec 2022
ID
Nickel ore export banacts on: mine · smelting onshore required
1 Jan 2020
AU
Production tax incentive for refined critical minerals, legislatedacts on: refine · from 1 Jul 2027
Feb 2025
A ban at the mine, a licence at the refinery, and an incentive at the same stage elsewhere are three different events. The module keeps them apart and dates each.
05Workbench

Objects left. Links center. Evidence right.

Select a mineral and the picture redraws as its chain across jurisdictions: the countries at each stage, the governments financing each project, the controls in force. The dossier serves capacity share by stage and country, funding by financing government, and the controls dated by jurisdiction. Switch the mineral or the jurisdiction from the rail.

app.svatantra.ai / critical-minerals / workbench
Svatantra
Ent
Minerals34
Lithium
Rare earths, NdPr
Cobalt
Graphite
Jurisdictions16
Australia
European Union
Japan
United States
Chile
Indonesia
Projects612
Separation plant · AU · 3 govts
Hydroxide refinery · US
Financing governments9
Japan · resources agency
United States · development finance
Australia · minerals facility
Controls48 in force
Rare earth export controls · CN
Cobalt export suspension · CD
Lithium · chain
lexicon keyed
Mine
Concentrate
Refine
Component
Cell / magnet
Lithiumhard rock and brine
AU 47% · CL 26%4 projects fundedfunded
AU · CL · ARspodumene, brinelinked
CN 68%hydroxide, carbonateconcentrated
KR · JP · UScathode · 2 DPA awardsfunded
CN · KR · UScells · 6 plants under loanfunded
shares carry source edition
Lithium
mineral · lexicon v2 · 5 stages served

Where it breaks

capacity share · source edition 2026
RefineCN 68% · concentrated
MineAU 47% · CL 26%
CellCN · KR · US

Which government is funding it

24 months · keyed to project
United States$2.6B · 5
Japan$1.8B · 4
AustraliaA$1.1B · 3
Co-financed projects5

What is restricted, where

in force
Controls on the chain7 · 5 jurisdictions
Acting on mineZW, ID, CD
Acting on refineCN, AU incentive
basis: program to project (attributed) / control to stage (keyed)
lexicon v2 · capacity source edition 2026 · control index 2026-09
withheld stages labeled · figures carry n
06Board and canvas

Build the case by dragging. Every card fills itself from the record.

Drop a mineral, a project, a program, or a jurisdiction onto the board. Ties carry the figure, the basis, and the n. Capacity shares carry the source edition they were read from; a stage with no published figure stays on the board with the figure withheld.

app.svatantra.ai / critical-minerals / board
Svatantra
Ent
Export memoControl calendar (.ics)Chain mapJurisdiction lensConcentration lensAsk the boardas of: 11 Sep 2026 · 16 markets
attributedkeyed
Live: drag the cards
mineral
Lithium
Concentrated stageRefine · CN 68%
Funded, 24 mo$5.0B · 13
project
Separation plant · AU
StageRefine
Financing governmentsAU + JP + US
control
Rare earth export controls
JurisdictionCN · 4 Apr 2025
Acts onRefine, magnet
financing government
Japan · resources agency
Into this chain$1.8B · 4
Co-financed withAU, US
suggested
+ 3 links
2 projects · 1 offtake
KeepDismiss
Served rows only. Figures stay in the instrument's currency; offtake stays a volume. Capacity shares carry their source edition.
07Capabilities

Capabilities that ride the module.

Existing Enterprise capabilities read from the same objects, so a supply-chain alert, a regulatory divergence read, or a constellation can be pinned to a board like any other object.

08Evidence

Seven layers on every figure.

Nothing on a ledger, a board, or a memo is computed on the fly from a model. It is served from the record, with its basis and its n. The standard is the same on the first day the module ships.

1Source attribution
2Statistical transparency
3Methodology disclosure
4Outcome logging
5Confidence framework
6Dissenting evidence
7Audit trail
09Modules

The same workbench, other domains.

Each module binds its own objects and link rules to the same investigation surface. Pin, link, board, memo: the grammar carries across.

Bring a mineral. Leave with the chain, every jurisdiction on it.

The module is in build. Design partners get the first seats, a monthly call with the founder, and a say in what the workbench serves first. Bring your own minerals and markets to the walkthrough.